Benefits...

Stairs

  • The cost of a finished stair is very competitive against precast or cast insitu stairs.
  • You don't need your best guys on stairs to install-2 men can achieve 2 flights and landings in under 6 hours.
  • No need to use stair protectors – formwork has folded steel edge
  • No making good on chipped risers etc.
  • Less crane time – Can block and tackle and sort out by hand
  • Smaller crane choice.

Handrails

  • Fitting a permanent rail at the start eliminates the need for temporary handrails or scaffold.

Programme

  • 2 men will set out, prop and finish 1 level in under 6 hours.
  • Stairs can be poured with the floors giving you good access the next da.y

Health and Safety

Design

  • No redesign required
  • StairMaster work from existing architects/engineers drawings to design the stair formwork

Short Lead Times

  • Possible to have stairs on site 3 weeks after design approval
    Non Standard Flights.
  • Every flight we produce is bespoke, therefore there is no extra cost for varying sizes.
  • Deliveries coordinated with site so that no more stairs than needed are sent in.

Non Standard Flights

  • Every flight we produce is bespoke, therefore there is no extra cost for varying sizes.