Benefits...
Stairs
- The cost of a finished stair is very competitive against precast or cast insitu stairs.
- You don't need your best guys on stairs to install-2 men can achieve 2 flights and landings in under 6 hours.
- No need to use stair protectors – formwork has folded steel edge
- No making good on chipped risers etc.
- Less crane time – Can block and tackle and sort out by hand
- Smaller crane choice.
Handrails
- Fitting a permanent rail at the start eliminates the need for temporary handrails or scaffold.
Programme
- 2 men will set out, prop and finish 1 level in under 6 hours.
- Stairs can be poured with the floors giving you good access the next da.y
Health and Safety
Design
- No redesign required
- StairMaster work from existing architects/engineers drawings to design the stair formwork
Short Lead Times
- Possible to have stairs on site 3 weeks after design approval
Non Standard Flights. - Every flight we produce is bespoke, therefore there is no extra cost for varying sizes.
- Deliveries coordinated with site so that no more stairs than needed are sent in.
Non Standard Flights
- Every flight we produce is bespoke, therefore there is no extra cost for varying sizes.